Salang Tunnel

Tunnel at the Salang Pass

Tunnel

Local time now: 05:04 (UTC+4:30), night.

Length of the tunnel
2.64 km1
Altitude of the Salang Pass
3,400 m1
Year complete
19642
Length of the Salang highway
82 km1

The Salang Tunnel

The Salang Tunnel takes the road between Kabul and the northern provinces of Afghanistan through the Hindu Kush mountains.12 It is 2.64 km long, a 2019 presentation for the Central Asia Regional Economic Cooperation (CAREC) programme says.1

A Soviet road

A US Army Corps of Engineers (USACE) article says that the Soviet Union built the Salang Corridor in the 1950s.2 It calls this "a gesture of goodwill to the Afghan people".2 The corridor has the tunnel and 19 galleries, covered parts of the road that protect travellers from the weather.2 The article gives 1964 as the year of completion of the tunnel.2

In December 1979, US intelligence had evidence that Soviet troops were securing the Salang Pass, a CIA study says.3 The pass is on the main road from the Soviet Union to Kabul.3 By 28 December, the Soviet 108th Division was on the road through the pass to Bagram and Kabul.3

Traffic and repairs

In 2010, snow avalanches at the pass killed 150 people and injured 400, the CAREC presentation says.1 In November 2012, USACE gave a contract of $12 million to repair the old tunnel.2

Traffic in 2019
5,500 vehicles a day1
Traffic that the tunnel was built for
1,000 vehicles a day1

Facts

The facts of the Salang Tunnel
Position, GEOnetKōtal-e Tōnal-e Sālang, UFI -3389653, designation TNL (tunnel)4
Elevation of the ground at the position, SRTM 30 m3,844 m5
Altitude of the Salang Pass, CAREC 20193,400 m1
Length of the tunnel, CAREC 20192.64 km1
Length of the highway, CAREC 201982 km1
Builder, USACEThe Soviet Union2
Galleries of the Salang Corridor, USACE192
Traffic that the tunnel was built for, CAREC 20191,000 vehicles a day1
Snow avalanches of 2010, CAREC 2019150 people dead and 400 injured1
Repair contract, USACE$12 million, November 20122

Sources

  1. Central Asia Regional Economic Cooperation (CAREC) Program, meeting in Tashkent, Uzbekistan. CAREC Corridor 5 & 6: Salang Pass (presentation), 25–26 April 2019, pages PDF pages 3–4 (sections 01 and 02). Read on 2026-11-07. Archived copy.
  2. Alicia Embrey, US Army Corps of Engineers, on DVIDS. The light at the end of the tunnel, 11 October 2013. Read on 2026-11-07. Archived copy.
  3. Douglas MacEachin, CIA Center for the Study of Intelligence. Predicting the Soviet Invasion of Afghanistan: The Intelligence Community's Record, pages 29, 31 (PDF pages). Read on 2026-11-07. Archived copy.
  4. US National Geospatial-Intelligence Agency. GEOnet Names Server, country file Afghanistan (file of 17 September 2026), feature UFI -3389653, Kōtal-e Tōnal-e Sālang (TNL, tunnel). Read on 2026-11-07. Archived copy.
  5. OpenTopoData (data: NASA Shuttle Radar Topography Mission). SRTM GL1 30 m elevation (dataset srtm30m) at 35.31603 N, 69.03871 E. Read on 2026-11-07.

The 3D app draws this page in a canvas. The Text version button of the site header shows the same page as text.