Enguri Dam

Dam

Local time now: 04:18 (UTC+4), night.

Height
271.5 m1
Length at the top
728 m1
Power
1,300 MW2
Reservoir
1.1 billion m³2

An arch in the Enguri canyon

The Enguri Dam stands in a narrow canyon of the Enguri river, in north-west Georgia.1 Its power plant is the largest hydropower plant of Georgia, the European Bank for Reconstruction and Development (EBRD) says.3 With the Vardnili plants downstream, the bank calls it an essential part of the energy system of the Caucasus.4

Once the tallest arch

Construction began in 1961.1 At that time, most experts saw the design as "an unachievable fantastic utopia", a presentation on the European Heritage Days website says.1 The operator says that the Soviet Union had no experience of such arch dams.5 It had no equipment to drill the rock.5 The builders therefore used Swedish and Finnish equipment.5

  1. 5 November 1978 The first of the five generating units starts.5
  2. 1980 The fifth unit starts. About 60% of the arch stands, and the concrete work goes on.5
  3. 1987 The dam is complete.1
  4. 2010 China completes the Xiaowan Dam, 292 m high. Until then, Enguri was the highest concrete arch dam in the world.1

Split by the war

Abkhazia lies between the Black Sea and the Caucasus mountains, the International Crisis Group says.6 Georgian law calls Abkhazia an occupied territory.7 Russia recognised Abkhazia as independent on 26 August 2008.8 In the war of 1992 to 1993, Abkhaz forces took control of most of Abkhazia.6 The war split the dam from its power plant, the operator says.9 The dam stands on land that the Georgian government controls, the European Investment Bank (EIB) says.2 A tunnel 15 km long takes the water to the underground power plant in the Gali district.2 The EIB describes the Gali district as "currently under Abkhazian and Russian control".2 The operator works on both sides of the administrative boundary line, the EBRD says.4

Ten people stayed

Georgian forces stopped the defence of their last positions in Abkhazia on 1 October 1993, the UN reported.10 The operator says that the director of the power plant, Giorgi Mikava, did not leave it.9 On 30 September, only about ten people stayed at the power plant.9 It did not stop.9

Shared power

Since the war, the two sides have shared the output of the power plant.11 The director of the power plant, Levan Mebonia, says that the two sides agreed orally to keep it out of politics.11

Share for Abkhazia by that agreement
40%11
Share for Georgia by that agreement
60%11
Abkhaz use in 2020 (Mebonia)
70%12

The operator calls the power plant the only place where Georgians and Abkhaz work together.13 In April 2024, damage in a tunnel of the power plant stopped it, OC Media reported.14 The Abkhaz authorities then extended the daily power cuts to six hours.14

Facts

The facts of the Enguri Dam
Other namesInguri (UN usage), Ingur (Abkhaz usage)6
Dam siteJvari, north-west Georgia1
Position on the dam42.7575° N, 42.0304° E15
Thickness10 m at the top, 90 m at the base1
Turbines5 Francis turbines of 260 MW (EIB)2
Tunnel to the power plant15 km long, 9.5 m across (EIB)2
Power plantUnderground, in the Gali district5
Maximum fall of the water (head)404 m16
OperatorEngurhesi LLC, 100% state-owned13
Output (2022)4.4 TWh4
Share of Georgian powerAbout 30%, with the Vardnili plants downstream (EBRD)4
Staff (2023)1,3234
Heritage statusCultural heritage monument since 201513

Sources

  1. Nino Kapanadze (Georgia), European Heritage Days. ENGURI HYDRO-POWER ARCH DAM: Industrial Heritage Site and Tourist Attraction, 15 November 2017, pages 2-4. Read on 2026-09-28. Archived copy.
  2. European Investment Bank. Project Completion Report: Vardnili & Enguri Hydro Rehabilitation, Georgia, 18 December 2019, pages 2. Read on 2026-09-28. Archived copy.
  3. European Bank for Reconstruction and Development. EBRD and EU support upgrade of Georgia’s largest hydropower plant, 16 February 2024. Read on 2026-09-28. Archived copy.
  4. European Bank for Reconstruction and Development. Enguri HPP – Safety Upgrade, Board report (project 54948), 13 December 2023, pages 8, 14, 17. Read on 2026-09-28. Archived copy.
  5. Engurhesi Ltd. The Construction. Read on 2026-09-28.
  6. International Crisis Group. Abkhazia Today (Europe Report N°176), 15 September 2006, pages i, 1. Read on 2026-09-28. Archived copy.
  7. Parliament of Georgia. Law of Georgia on Occupied Territories, 23 October 2008. Read on 2026-09-28. Archived copy.
  8. President of Russia. Statement by President of Russia Dmitry Medvedev, 26 August 2008. Read on 2026-09-28. Archived copy.
  9. Engurhesi Ltd. The Operation. Read on 2026-09-28.
  10. United Nations Security Council. Report of the Secretary-General concerning the situation in Abkhazia, Georgia (S/26551), 7 October 1993, pages 2. Read on 2026-09-28.
  11. JAMnews. “Georgians and Abkhazians work well together when they both need it” – Inguri HPP director, 29 October 2023. Read on 2026-09-28. Archived copy.
  12. Marianna Kotova, OC Media. Abkhazia introduces rolling blackouts, 1 July 2021. Read on 2026-09-28. Archived copy.
  13. Engurhesi Ltd. The Activity. Read on 2026-09-28.
  14. OC Media. Abkhazia introduces six-hour power cuts following Enguri HPP damage, 8 April 2024. Read on 2026-09-28. Archived copy.
  15. EOX IT Services GmbH, with modified Copernicus Sentinel data 2021. Sentinel-2 cloudless 2021 (s2cloudless). Read on 2026-09-28. Archived copy.
  16. Engurhesi Ltd. ტექნიკური მაჩვენებლები (Technical indicators). Read on 2026-09-28.

The 3D app draws this page in a canvas. The Text version button of the site header shows the same page as text.