Roki Tunnel
Local time now: 04:18 (UTC+4), night.
The road under the main ridge
The Roki Tunnel takes the Transcaucasian highway under the main ridge of the Caucasus.1 It links North Ossetia–Alania, a republic of Russia,4 with South Ossetia.1 Georgian law calls South Ossetia the Tskhinvali region, an occupied territory.5 Russia recognised South Ossetia as independent on 26 August 2008.6
Through the main ridge
The Russian road agency gives a length of 3,730 m for the tunnel.1 The firm that designed it gives 3,660 m for the length.7 The road agency gives the heights of the two entrances, the portals: 2,040 m in the north and 2,112 m in the south.1 Design work began in 1958.7 The designers studied 90 routes for the tunnel.7 The newspaper Rossiyskaya Gazeta says that construction began only in 1975.8 It ended in 1985, the designers say.7 CAST, a Moscow research centre, says that only one paved road links South Ossetia to Russia.9 This road goes through the tunnel, with a single lane in each direction.9 CAST calls the tunnel a bottleneck.9
7 or 8 August 2008
On the night of 7 to 8 August 2008, Georgian forces shelled Tskhinvali.10 It is the main town of South Ossetia.11 The EU fact-finding mission says that this shelling began the large-scale war.10 Georgia and Russia disagree about when Russian troops first went through the tunnel.12
- Before dawn, 7 August Georgia says that intercepted phone calls show Russian armour going through the tunnel.12
- 14:30, 8 August Russia told the EU mission that its first units entered South Ossetia at this time.10
The EU mission was unable to verify the Georgian view.11 It says that volunteers or mercenaries seem to have come through the tunnel from Russia in early August.10
The Gupta bridge
CAST says that a Russian column with T-72B tanks went through the tunnel early on 8 August.9 At about 07:00, four Georgian Su-25 jets bombed it and the Gupta bridge.9 No bomb hit the column or the bridge, CAST says.9 The EU mission cites reports that Georgian attacks damaged the bridge.11
Rebuilt
In 2010, Russia started to rebuild the tunnel, the Russian road agency says.1 Parts of its arched roof had collapsed.1 The tunnel had no waterproofing.1 The rebuilt tunnel opened on 5 November 2014.3 The Russian checkpoint at Nizhny Zaramag lies in North Ossetia–Alania.4 Russia calls it its only border crossing with the Republic of South Ossetia.13 Georgian law lets foreign citizens and stateless persons enter the Tskhinvali region only from the direction of Gori municipality.5 Entry from other directions is punishable under the Criminal Code of Georgia.5 The law allows special permission and lists some exceptions.5
Facts
| Road | Transcaucasian highway, km 931 |
|---|---|
| Mountain above | Mount Sokhs1 |
| Tunnel midpoint | 42.6157° N, 44.1028° E14 |
| Length (designer) | 3,660 m7 |
| South portal road level (designer) | 2,122 m7 |
| Service gallery | 3,805 m1 |
| Carriageway | 7.5 m wide, 4.75 m high8 |
| Lanes | One in each direction (CAST)9 |
| Design began | 19587 |
| Construction began (Rossiyskaya Gazeta) | 19758 |
| Construction ended | 19857 |
| Rebuild began | 20101 |
| Cost of the rebuild | More than USD 400 million (Russian Ministry of Transport)3 |
| Checkpoint | Nizhny Zaramag, open 24 hours4 |
| Checkpoint traffic, first half of 2026 | 173,600 vehicles13 |
Sources
- FKU Uprdor Kavkaz (Rosavtodor). Реконструкция Рокского тоннеля (Reconstruction of the Roki tunnel), About 2015. Read on 2026-09-28. Archived copy.
- Bamtonnelstroy-Most (contractor). Рокский тоннель открыт для движения автотранспорта (The Roki tunnel is open to traffic), 6 November 2014. Read on 2026-09-28. Archived copy.
- Radio Svoboda (RFE/RL), citing Interfax. Отремонтирован тоннель, по которому Россия вошла в Грузию в 2008 году (The tunnel by which Russia entered Georgia in 2008 is repaired), 5 November 2014. Read on 2026-09-28. Archived copy.
- Rosgranstroy. Нижний Зарамаг (Nizhny Zaramag). Read on 2026-09-28.
- Parliament of Georgia. Law of Georgia on Occupied Territories, 23 October 2008. Read on 2026-09-28. Archived copy.
- President of Russia. Statement by President of Russia Dmitry Medvedev, 26 August 2008. Read on 2026-09-28. Archived copy.
- Lenmetrogiprotrans (designer). Рокский тоннель (Roki tunnel). Read on 2026-09-28. Archived copy.
- Vladimir Anosov and Svetlana Yemelyanova, Rossiyskaya Gazeta. В горах Осетии открыли тоннель, строившийся почти 40 лет (A tunnel that took almost 40 years to build opens in the mountains of Ossetia), 30 October 2014. Read on 2026-09-28. Archived copy.
- M. S. Barabanov, A. V. Lavrov, and V. A. Tseluiko, edited by R. N. Pukhov, Centre for Analysis of Strategies and Technologies (CAST), Moscow. The Tanks of August, 2010, pages 44-45, 49, 51-52, 118. Read on 2026-09-28. Archived copy.
- IIFFMCG (Council of the EU mandate, head of mission Heidi Tagliavini). Independent International Fact-Finding Mission on the Conflict in Georgia, Report, Volume I, September 2009, pages 11, 20. Read on 2026-09-28. Archived copy.
- IIFFMCG (Council of the EU mandate, head of mission Heidi Tagliavini). Independent International Fact-Finding Mission on the Conflict in Georgia, Report, Volume II, September 2009, pages 209, 210, 254. Read on 2026-09-28. Archived copy.
- C. J. Chivers, with Dan Bilefsky, Thom Shanker, and Michael Schwirtz, The New York Times. Georgia Offers Fresh Evidence on War’s Start, 15 September 2008, pages 1. Read on 2026-09-28. Archived copy.
- Ministry of Transport of the Russian Federation. Основные работы по модернизации пункта пропуска Нижний Зарамаг планируется завершить до конца июля (The main works to modernise the Nizhny Zaramag checkpoint are to finish by the end of July), 6 July 2026. Read on 2026-09-28.
- EOX IT Services GmbH, with modified Copernicus Sentinel data 2021. Sentinel-2 cloudless 2021 (s2cloudless). Read on 2026-09-28. Archived copy.