Hoover Dam

Dam

Local time now: 16:26 (UTC-8), day.

Height
726.4 ft (221.4 m)1
Crest length
1,244 ft (379.2 m)8
Power plant
About 2,080 MW4
Dedication ceremony
30 September 19353

Black Canyon

Hoover Dam spans the Colorado River in Black Canyon, between Arizona and Nevada.1 It is 726.4 ft (221.4 m) from foundation rock to the roadway on its crest.1

Built in the Great Depression

In all, 21,000 men worked on the dam, the Bureau of Reclamation says.1 The most in one day was 5,218, in June 1934.1 The work brought workers to Las Vegas, which grew fast during the Great Depression.2

  1. 20 April 1931 The Bureau of Reclamation tells the contractor, Six Companies, to start work.3
  2. 6 June 1933 The first concrete goes into the dam.3
  3. 1 February 1935 The dam starts to hold back water in Lake Mead.3
  4. 30 September 1935 President Franklin D. Roosevelt dedicates the dam at a ceremony.3

Power, water, and a name

The power plant has 17 main turbines.4 Its nameplate capacity, the rated power, is about 2,080 megawatts.4 From 1939 to 1949, it was the largest hydroelectric plant in the world.4 The top of the spillway gates is at 1,221.4 ft (372.3 m) above sea level.5 With its water at this level, Lake Mead reaches about 110 miles (177 km) upstream.5

The dam has the name of Herbert Hoover, the 31st President of the United States.6 After he left office, the Interior Department often used the name "Boulder Dam".6 In 1947, President Truman signed a resolution that restored the name Hoover Dam.6 Eagle Dynamics shows the dam and Lake Mead on its Nevada map.7

Facts

The facts of the Hoover Dam
TypeConcrete arch-gravity: its weight and its horizontal arch both carry the load of the water1
LocationBlack Canyon of the Colorado River, between Arizona and Nevada1
Height, foundation rock to the crest roadway726.4 ft (221.4 m)1
Crest elevation1,232.0 ft (375.5 m)8
Width45 ft (13.7 m) at the crest, 660 ft (201.2 m) at the base8
Concrete in the dam3.25 million cubic yards (about 2.48 million m³)1
Workers21,000 in all, 3,500 a day on average, 5,218 a day at most (June 1934)1
First generator in full operationN-2, 26 October 19363
Main turbines174
Average generation, 1947–2008About 4.2 billion kWh a year4
Largest hydroelectric plant in the world1939 to 19494
Lake Mead, with its water at the top of the spillway gates, 1,221.4 ft (372.3 m)Reaches about 110 miles (177 km) upstream, holds 28,945,000 acre-feet (about 35.7 km³)5
OperatorBureau of Reclamation5
Name Hoover Dam restored30 April 19476
On the DCS mapHoover Dam and Lake Mead7

Sources

  1. Bureau of Reclamation, Lower Colorado Region. Hoover Dam - Frequently Asked Questions and Answers: The Dam, 12 March 2015. Read on 2026-11-07. Archived copy.
  2. City of Las Vegas. Timeline (History). Read on 2026-11-07. Archived copy.
  3. Bureau of Reclamation. The Story of Hoover Dam - Articles: Chronology, 13 July 2022. Read on 2026-11-07. Archived copy.
  4. Bureau of Reclamation. Hoover Dam - Frequently Asked Questions and Answers: Power, 1 August 2018. Read on 2026-11-07. Archived copy.
  5. Bureau of Reclamation. Hoover Dam - Frequently Asked Questions and Answers: Lake Mead, 12 March 2015. Read on 2026-11-07. Archived copy.
  6. Bureau of Reclamation. What's In A Name?, 13 July 2022. Read on 2026-11-07. Archived copy.
  7. Eagle Dynamics. DCS: NEVADA Test and Training Range Map (product page). Read on 2026-11-07. Archived copy.
  8. Bureau of Reclamation. Hoover Dam (Projects and Facilities, facility data). Read on 2026-11-07. Archived copy.

The 3D app draws this page in a canvas. The Text version button of the site header shows the same page as text.